Carbide Processors, Inc
World's Best Brazed Tools

(Plus parts, supplies and technology to build them)

 

 

 

Carbide Suppliers Questionnaire

 

Introduction

Our customers are upset if there are defects as few as one in a thousand.  Therefore we have to do better than that.

Can you do better?

How?

Proof?

 

Can we meet?

Metallurgist

Production manager

Head of Q.C.

 

What sort of a program are you prepared to offer us?

Do calculations e.g. 30,000,000 saws x 24 tips by size = how many tons? How many $?

WA 7150 is about 1,000 parts per pound

72,000,000 = 72,000 pounds = 36 tons

List price is $0.081 each

72,000,000 x $0.081 = $5,832,000.00

 

Quality

We need specifications for quality and for delivery

The specifications must be readily and easily verifiable at both ends

What kind of specifications do you have on your materials?

What kind of information do you have on the use?

On grinding

 

Specifications on materials?

What chemicals are used?

Chemical % - Test for content by %

Range +/- on chemical constituents

How well are they mixed

Use a backscatter electron microscope to show the consistency of the surface e.g. veins

Quality of the chemicals used

Virgin material

Grain size

What else is important?

 

Inspection points

How many

Where

What % gets rejected at each stage?

 

Suitability for use

What standards for wear

Tests for wear

What standards for toughness

Tests for toughness

Tips are shipped clean or dirty?

Clean to what degree?

Variations in size

Important because of automatic equipment

 

Surface treatments

What standards for surface chemistry

Tests for surface chemistry

How do you select which surface treatment to use?

Surface friction for automatic feeders

How do you test surface condition?

Flow of a measured piece?

Contact angle?

 

Testing

Test procedures - what do you use now?

Test lab -  What do we need to test at our location?

How much education can you provide?

Can you provide on-site testing?

Training?

Equipment?

 

Delivery

We need specifications for delivery

The specifications must be readily and easily verifiable at both ends

On time delivery means from the originally promised date?

 

Capacity

How many parts can you supply?

When?

 

What will our priority be for production?

Our flow of shipments will be

Starting_______________

Monthly volumes__________

Monthly variations__________

 

What % of your shipped parts come back as defective?

What % of your shipped parts are shipped late?

What % of your shipped parts are returned for any reason?

% by total parts?

% by total shipment?

What % of customers returned parts in 1998 and 1999?

How does this compare with other WC suppliers?

 

References top 10 world customers

Top 10 US customers

 

How do you handle late shipments?

What are the top 5 reasons for late shipments?

 

Customer Service

What guarantee is there on the material?

Your guarantee to us and to our customers?

Chain of command

Decision making authority

How much?

At what level?

Our contact?

 

Can we see lab results on tests of customer failure problems?

How did you solve these problems?

Can we see lab results on tests of customer braze problems?

How did you solve these problems?

 

New Products

How many grades of carbide do you make?

How many grades of cermets do you make?

What is in development?

When will it be ready for testing?

When will it be ready for production?

 

What improvements can you give us now?

How fast can you develop and deliver new grades to test?

 

Intellectual property

Confidentiality agreements

Who owns rights to new materials where we:

Conceive

Design

Develop

What rights do each of us own.

 

Price

Cost of materials

Where is the cost in the parts?

Materials?

Processing?

Post treatment?

How much can we save by using TiCN instead of WC?

 

Cooperation in R&D

Is supplier willing to supply samples at their cost?

How much is supplier willing to contribute to our research?

How much is supplier willing to contribute to advertising and promotion?

 

Financial terms

Can we get the same consignment inventory that others get?

Supplier will get paid when we do? 

What discounts do you offer at additional volume levels?